Projects – À¶Ý®ÊÓÆµ /en/ Wed, 24 Sep 2025 03:25:35 +0000 en-US hourly 1 /wp-content/uploads/2026/01/cropped-Hinh-thoi-01-32x32.png Projects – À¶Ý®ÊÓÆµ /en/ 32 32 SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3 /en/project/sailun-vietnam-factory-expansion-phase-2-phase-3/ Wed, 24 Sep 2025 03:25:35 +0000 /?post_type=project&p=15540 The Sailun Vietnam Factory Expansion – Phase 2 & Phase 3 Project, invested by Sailun Co., Ltd., is located in Go Dau District, Tay Ninh Province.

The development comprises 1 floor with a total construction floor area of 98,000 m², including main facilities serving the expansion of tire production lines.

Phuoc Thanh undertook the package of construction, finishing, and MEP works, implemented from 02/2021 to 07/2023. During execution, Phuoc Thanh applied advanced technical solutions, strict management of quality, schedule, and safety, meeting the stringent requirements of the client.

The completion of this expansion project contributes to strengthening Sailun’s tire production and export capacity in Vietnam, while promoting supporting industries and local economic growth.

]]>
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1 /en/project/radian-jinyu-vietnam-tire-factory-phase-1/ Wed, 24 Sep 2025 03:17:30 +0000 /?post_type=project&p=15526 The Radian Jinyu (Vietnam) Tire Factory – Phase 1 Project, invested by Jinyu (Vietnam) Tire Co., Ltd., is located in Phuoc Dong Industrial Park, Don Thuan Commune, Trang Bang Town, Tay Ninh Province.

The development comprises 2 floors with a total construction floor area of 19,250 m², including fabric liner workshop, main switch station, and cooling station.

Phuoc Thanh served as the contractor for construction, finishing, and MEP works, implemented from 06/2020 to 11/2020. The project was executed in strict compliance with technical standards and safety–quality requirements, ensuring the committed schedule to the client.

Once operational, the factory contributes to enhancing tire production capacity in Vietnam, while also driving supporting industries and attracting FDI investment in Tay Ninh Province.

]]>
JINYU TIRE FACTORY /en/project/jinyu-tire-factory/ Wed, 24 Sep 2025 03:04:51 +0000 /?post_type=project&p=15505 The JINYU TIRE Factory Project, invested by JINYU (Vietnam) Tire Co., Ltd., is located in Phuoc Dong Industrial Park, Tay Ninh Province.

The development comprises 2 floors, with a total construction floor area of 19,250 m², aiming to expand tire production capacity to meet both domestic and international market demands.

Phuoc Thanh served as the general contractor for construction, finishing, and MEP works, commenced in 06/2020 and completed in 11/2020, fulfilling all requirements in terms of schedule, quality, and technical standards.

The project contributes to enhancing tire production capacity and promoting economic growth in Tay Ninh Province.

]]>
HAILIDE VIETNAM FABRIC WORKSHOP /en/project/hailide-vietnam-fabric-workshop/ Wed, 24 Sep 2025 02:03:59 +0000 /?post_type=project&p=15497 The Civil Construction Project of Hailide Vietnam Fabric Workshop is implemented at Phuoc Dong Industrial Park, Tay Ninh Province, with a total CFA of 74,588 m² (including 12,592 m² of construction and 61,996 m² of technical infrastructure).

Package A includes Office Building, Canteen, Guard Houses 3 & 4, Pump Room – Underground Water Tank, Southern Traffic Connection, and External Infrastructure.

As the construction contractor, Phuoc Thanh commits to implementing the project with technical capability, experienced workforce, and advanced management solutions, ensuring progress, quality, and safety, contributing to the production goals of the Client.

]]>
HLI ECOHUB NAM HA FACTORY /en/project/hli-ecohub-nam-ha-factory/ Tue, 23 Sep 2025 09:18:51 +0000 /?post_type=project&p=15345 The HLI Ecohub Nam Ha Factory project, invested by Hoa Long Construction Investment Joint Stock Company, is located in Nam Ha 2 Industrial Cluster, Dong Ha Commune, Duc Linh District, Binh Thuan Province. The development consists of six factories and an operation building, with a total construction area of 42,902 m².

Phuoc Thanh undertakes structural works, MEP systems, and infrastructure. The project commenced in November 2024 and is expected to be completed in August 2025.

Beyond expanding local production capacity, the project creates numerous job opportunities and contributes to improving the living standards of local residents. HLI Ecohub Nam Ha is expected to become a driving force for the rapid and sustainable socio-economic development of Duc Linh District.

]]>
CULTURAL, SPORTS, AND RECREATION SQUARE IN CAN GIO DISTRICT /en/project/cultural-sports-and-recreation-square-in-can-gio-district/ Tue, 23 Sep 2025 08:59:41 +0000 /?post_type=project&p=15272 The Cultural, Sports, and Recreation Square project in Can Gio District is developed on Duyen Hai Street, Can Thanh Town, Can Gio District, Ho Chi Minh City, covering an area of more than 9.4 hectares. This development plays a vital role in creating a community space for cultural and sports events while enhancing the spiritual and social well-being of local residents.

Phuoc Thanh undertakes the construction of the entire square. The project commenced on May 19, 2025, and is expected to be completed on April 14, 2026.

]]>
INTERNATIONAL BUDDHIST CONFERENCE CENTER /en/project/international-buddhist-conference-center/ Tue, 23 Sep 2025 08:30:11 +0000 /?post_type=project&p=15183 The International Buddhist Conference Center project is located in Tan Kien Commune, Binh Chanh District, Ho Chi Minh City, and is invested by the Executive Council of the Vietnam Buddhist Sangha. The development includes a conference block (2 basement levels, 6 above-ground floors, and a roof structure) and a service block (1 basement level and 3 above-ground floors). The project is designed with modern architecture, meeting international standards.

Phuoc Thanh undertakes the role of structural works and MEP system contractor. The project commenced on October 15, 2024, and is expected to be completed in Q2/2026.

]]>
S.I.S STROKE TREATMENT SPECIALIZED RESEARCH AND TRAINING CENTER /en/project/sis-stroke-treatment-specialized-research-and-training-center/ Tue, 23 Sep 2025 07:53:52 +0000 /?post_type=project&p=15063 The S.I.S STROKE TREATMENT SPECIALIZED RESEARCH AND TRAINING CENTER, invested by S.I.S Vietnam International Service Joint Stock Company, is located in the High-Tech Park, Ho Chi Minh City.
The project consists of 1 basement and 11 above-ground floors, with a total floor area of 40,430 m².
Phuoc Thanh serves as the general contractor, with construction starting in July 2025 and scheduled for completion in February 2026.
The development is set to become a modern international service hub, contributing to the advancement of high-tech infrastructure and attracting foreign investment to Ho Chi Minh City.

]]>
HFIC COMMERCIAL – SERVICE OFFICE HEADQUARTERS /en/project/hfic-commercial-service-office-headquarters/ Mon, 22 Sep 2025 09:39:37 +0000 /?post_type=project&p=14549 The HFIC Commercial – Service Office Headquarters is located at 33 – 35 – 37 – 39 Pasteur Street, District 1, Ho Chi Minh City, developed with a scale of 14 above-ground floors and 3 basements.

The project features a modern design harmonized with the central urban landscape, meeting green architecture standards, ensuring energy efficiency, and aiming to become a key foundation in the development of financial technology infrastructure in Ho Chi Minh City.

As the Construction Contractor, Phuoc Thanh commits to implementing the project with a skilled engineering and workforce team, modern equipment, and advanced construction technologies, ensuring schedule – quality – safety.

]]>
RICCA RESIDENTIAL COMPLEX /en/project/ricca-residential-complex/ Mon, 22 Sep 2025 09:30:38 +0000 /?post_type=project&p=14465 The Ricca Residential Complex, located in Phu Huu Ward, District 9, Ho Chi Minh City, is invested by Dien Phuc Thanh Construction and Housing Business Co., Ltd. This high-rise apartment development integrates green living spaces with a comprehensive system of on-site amenities, helping to establish a modern, civilised community in the eastern part of the city.

The project comprises one basement level and eighteen above-ground storeys, with a total gross floor area of 52,010 m². À¶Ý®ÊÓÆµ serves as the Design & Build (D&B) general contractor, responsible for structural works, finishing, and the complete mechanical–electrical (M&E) systems. Construction commenced in December 2019 and was completed in September 2021, contributing to improved residential infrastructure and setting a new standard of living for the area’s residents.

]]>